Natural GasActiveKırgaz Gas Pipeline
Kırıkkale and Kırşehir, Türkiye
Approximately 200 km of natural gas distribution pipeline constructed each year, with work continuing without interruption.
Development of a 26 MW geothermal power plant, including the production and reinjection wells, the geothermal fluid gathering and reinjection pipelines, separator and energy-conversion (binary/ORC) units, the turbine-generator and cooling systems, and the switchyard with full grid-connection infrastructure.
Development of a 26 MW geothermal power plant, including the production and reinjection wells, the geothermal fluid gathering and reinjection pipelines, separator and energy-conversion (binary/ORC) units, the turbine-generator and cooling systems, and the switchyard with full grid-connection infrastructure.